In only I were 1.15 times faster or had better planning (why didn’t I use the Saturday Sunday at the end of the first week 🤦🏼♂️), things would’ve happened differently. I think I’m becoming stupid and my tolerance levels are going down too.
So this happened a while back ..
I was given a code base which didn’t have any changes in the last two years and I was asked to add a feature to this. This was my first task in this new group I was part of. I had two weeks to do this starting on a Monday.
Partway through implementation I realised that the code base is a pile of shit and I wasn’t doing myself or anyone else any favours by shitting on it.
It’s Wednesday. I’ve dealt with many other codebases before but the urge to rewrite this particular one was just unlike anything else. And so I started changing code and before I realised, I modified almost all the important files.
I got sick of this mixed up code and started a rewrite from scratch. It was Friday and I finally had just the basic mechanics of the whole thing working. Now I needed to add all the functionalities and also my new feature.
It should be noted that at no point did I tell any of the superiors I was doing this fearing what they might say and also fearing going back to adding shit to shit.
By the end of the second week, the rewrite was complete and I only had the new feature to add. The rewrite was significantly smaller, compartmentalised and well commented because I did the bloody commenting (where it was not obvious from the code). So on Friday, I was asked about the progress and I told them that it needed some more work and that I need a couple more days. And I got shit for it. I was told it was a mistake giving this task to me and that I am not competent enough. One of the superiors told the other superior about perhaps giving me something more suited to my level. To be fair to them, they were expecting the work in the two weeks to be for the new feature.
And in two days’ time, on Monday (I worked on Saturday and half of Sunday), I finished the whole thing and gave it to them. New feature was working. And I still did not tell them what I did. The tool worked fine so they had no idea what happened because this project had no version control and I pointed them to a new directory with the new code with a first commit.