13

Workload rant.

Our new line manager is overly expecting from all of us (product/design/tech) and is micro managing on ground level without having any real sense of reality. He just wants everything to be built overnight.

He is smart, no doubt about that. But guess, I learnt from him what I had to. Not to stereotype but he is a typical Indian manager who keeps pushing boundaries.

He just added 80 features for Q1 roadmap with on 3 PMs, 1 Designer, 1TPM, and bunch of techies .

What the actual fuck! 😂😂😂 And he wanted to add more, thankfully we ran out of time in the meeting.

And my super talent and genius blabbering co-woker who works mechanically just fucked herself real bad. Lol

I kept telling her not to add Feature XYZ to the roadmap because:
1. There'll be spill over from Q4
2. She is already overloaded with 1 task and keeps crying all day about being unable to handle it
3. She is setting wrong expectations with management for herself and rest of the team
4. Boss will add more work and she'll be fucked

She was adamant and did not listen.

Now this is what happened:
1. ALL her Q4 items got pushed to Q1. LMFAO
2. She was literally crying since morning on calls for being overloaded and we are yet to start Q1 assignments
3. Additional tasks along side feature XYZ were added on her plate

I tried to push back the manager and that's when he said okay, let's keep some items for Q2.

But holy shit. 80 features between such a small team and wanted to done in few weeks.

I need to pump more steam in my job hunt activity. This place is ridiculously toxic.

Comments
Add Comment