I shall refer to the client as cunt for the purposes of this rant. All design work signed off. Near completion of project, cunt sends an email moving stuff around and changing the design. I send the cunt an email telling him that I will review his requests and send a quote through detailing cost implications and extra time added to his deadline to complete. Cunt says he wasn't aware there would be extra costs. I refer the cunt back to the quote and contract which clearly distinguishes the design phase and build phase explaining change control. Not heard back from said cunt.

Comments
  • 0
    Omg what a stupid cunt
  • 1
    i hope u did take some of hers ...
    .
    .
    .
    .
    money as down-payment
  • 4
    Always take some free changes into account in the initial quote. Cunts always want to change stuff, so why not save everyone time.
  • 9
    @uselesshero I always do at the design stage, its normal. When the design is signed off, i don't want to be fucking about with layout changes and shit like that. A builder working from architects drawings will want more coin if you move the kitchen after its been fucking built.
  • 1
    Excellent rant. Excellent analogy with the kitchen @helloworld
  • 1
    @helloworld Totally agree but that is still not how cunts think. Sadly.
  • 0
    @uselesshero True, and that's why we refer to them as cunts.