What are you thoughts on working on more than one project at any given time?

Comments
  • 1
    That's my daily jam.
  • 0
    @Root Do you enjoy it? Would you prefer to work on only a single project?
  • 1
    @whiskey0 No, unless it meant I worked less. or if the project remained interesting.

    Switching projects gives me something fresh to do. If I keep doing the same thing for too long I grow tired of it.
  • 1
    Same as @Root. It usually means that project A takes 60% of my time, project B around 80%, then project C something like 50%.
  • 0
    Yea why not. As long as expectations aren't unreasonable it should work out great.