Join devRant
Do all the things like
++ or -- rants, post your own rants, comment on others' rants and build your customized dev avatar
Sign Up
Pipeless API
From the creators of devRant, Pipeless lets you power real-time personalized recommendations and activity feeds using a simple API
Learn More
Search - "someone's had a bad day"
-
So I'm back from vacation! It's my first day back, and I'm feeling refreshed and chipper, and motivated to get a bunch of things done quickly so I can slack off a bit later. It's a great plan.
First up: I need to finish up tiny thing from my previous ticket -- I had overlooked it in the description before. (I couldn't test this feature [push notifications] locally so I left it to QA to test while I was gone.)
It amounted to changing how we pull a due date out of the DB; some merchants use X, a couple use Y. Instead of hardcoding them, it would use a setting that admins can update on the fly.
Several methods deep, the current due date gets pulled indirectly from another class, so it's non-trivial to update; I start working through it.
But wait, if we're displaying a due date that differs from the date we're actually using internally, that's legit bad. So I investigate if I need to update the internals, too.
After awhile, I start to make lunch. I ask my boss if it's display-only (best case) and... no response. More investigating.
I start to make a late lunch. A wild sickness appears! Rush to bathroom; lose two turns.
I come back and get distracted by more investigating. I start to make an early dinner... and end up making dinner for my monster instead.
Boss responds, tells me it's just for display (yay!) and that we should use <macro resource feature> instead.
I talk to Mr. Product about which macros I should add; he doesn't respond.
I go back to making lunch-turn-dinner for myself; monster comes back and he's still hungry (as he never asks for more), so I make him dinner.
I check Slack again; Mr. Product still hasn't responded. I go back to making dinner.
Most of the way through cooking, I get a notification! Product says he's talking it through with my boss, who will update me on it. Okay fine. I finish making dinner and go eat.
No response from boss; I start looking through my next ticket.
No response from boss. I ping him and ask for an update, and he says "What are you talking about?" Apparently product never talked to bossmang =/ I ask him about the resources, and he says there's no need to create any more as the one I need already exists! Yay!
So my feature went from a large, complex refactor all the way down to a -1+2 diff. That's freaking amazing, and it only took the entire day!
I run the related specs, which take forever, then commit and push.
Push rejected; pull first! Fair, I have been gone for two weeks. I pull, and git complains about my .gitignore and some local changes. fine, whatever. Except I forgot I had my .gitignore ignored (skipped worktree). Finally figure that out, clean up my tree, and merge.
Time to run the specs again! Gems are out of date. Okay, I go run `bundle install` and ... Ruby is no longer installed? Turns out one of the changes was an upgrade to Ruby 2.5.8.
Alright, I run `rvm use ruby-2.5.8` and.... rvm: command not found. What. I inspect the errors from before and... ah! Someone's brain fell out and they installed rbenv instead of the expected rvm on my mac. Fine, time to figure it out. `rbenv which ruby`; error. `rbenv install --list`; skyscraper-long list that contains bloody everything EXCEPT 2.5.8! Literally 2.5 through 2.5.7 and then 2.6.0-dev. asjdfklasdjf
Then I remember before I left people on Slack made a big deal about upgrading Ruby, so I go looking. Dummy me forgot about the search feature for a painful ten minutes. :( Search found the upgrade instructions right away, ofc. I follow them, and... each step takes freaking forever. Meanwhile my children are having a yelling duet in the immediate background, punctuated with screams and banging toys on furniture.
Eventually (seriously like twenty-five minutes later) I make it through the list. I cd into my project directory and... I get an error message and I'm not in the project directory? what. Oh, it's a zsh thing. k, I work around that, and try to run my specs. Fail.
I need to update my gems; k. `bundle install` and... twenty minutes later... all done.
I go to run my specs and... RubyMine reports I'm using 2.5.4 instead of 2.5.8? That can't be right. `ruby --version` reports 2.5.8; `rbenv version` reports 2.5.8? Fuck it, I've fought with this long enough. Restarting fixes everything, right? So I restart. when my mac comes back to life, I try again; same issue. After fighting for another ten minutes, I find a version toggle in RubyMine's settings, and update it to 2.5.8. It indexes for five minutes. ugh.
Also! After the restart, this company-installed surveillance "security" runs and lags my computer to hell. Highest spec MacBook Pro and it takes 2-5 seconds just to switch between desktops!
I run specs again. Hey look! Missing dependency: no execjs. I can't run the specs.
Fuck. This. I'll just push and let the CI run specs for me.
I just don't care anymore. It's now 8pm and I've spent the past 11 hours on a -1+2 diff!
What a great first day back! Everything is just the way I left it.rant just like always eep; 1 character left! first day back from vacation miscommunication is the norm endless problems ruby6 -
The story of the shittiest, FUCKING WORST day of work.
TLDR: shitty day at work, car crash to end the day.
So, let tell you about what could possibly be the worst day I had since I started working.
This morning, my alarm didn't work, woke up 30 minutes before an appointment I had with a client.
Arrived late at the client, as I start deploying. They don't have any way to transfer the deployment package to the secured server. Lost 45 minutes there.
Deployment goes pretty well. My client asks me to stay while they load some data into the app. Everything's pretty easy to work out. Just need to input 3 CSV with the correct format (which the client defined since the beginning).
I end up watching an Excel Macro called "Brigitte" (I'm not fucking kinding, could'nt have thought of that) work for 4 hours straight. Files are badly formatted and don't work.
Troubbleshooting thoses files with a fucking loader that does not tell you anything about why it failed (our fault on that one)
I leave the client at 7:30pm, going back at work, leave at 9pm.
At this point, I just want to buy some food, go home and watch series.
But NO, A FUCKING MORRON OF A BUS DRIVER had to switch lanes as I was overtaking him. Getting me crushed between the bus and the concrete blocks.
Cops were fucking dickheads, being very mean even tho I was still shaking from the adrenaline.
In conclusion, the day could have been worst. The devs at the clients are pretty cool guys and we actually had some fun troubleshooting. At work, there was still one of my colleagues who cheered me up telling me about his day.
And when I think of it, I could have got really hurt (or even worst) in the crash.
A bad day is a bad day, tomorrow morning I'm still going to get up and go to a job I love, with people I love working with.
Very big rant (sorry about that if someone's still reading)9 -
Class normal people:
Def good day:
"Manager was out, had great lunch, got a. special someone's number, successfully avoided traffic, got in special someone's pants"
Def bad day:
"Stubbed toe this morning, rained all day, broke up w. special someone, sat in traffic for 2 hrs"
Class software dev:
Def good day:
"Wrote lots of working code, little to no bugs, checked in no-probs, ahead od schedule for ship, extra time for ping-pong!"
Def bad day:
"Somone fucked up the latest build, coffee machine's broken, ran out of adderall, manager on everyone's @$$ for a fix, 5 hrs later...no fix, no blames, no coffee, board meeting; fml"