HR sent around updated contracts asking everyone to sign them since the company changed its name, fair enough.
In the contract it stated "Your normal place of work will be X" - only X was many miles away, and I'd never worked there, never planned too. Assumed it was a mistake, sent it back. HR refused to change it, stating that the "normal place of work does not need to be the place where you normally work."
A lot of back and forth entailed, I refused to sign, I was reprimanded for not doing so, I was asked what my problem was as it made no material difference, and then I eventually replied with:
"Angela, I'm refusing to sign this as it's factually incorrect. No further explanation is required. I'll maybe consider signing this if you sign a piece of paper declaring you believe the moon is made of cheese, and you're the cow the milk came from to make it."
A very strongly worded email came back about how this was going on my record, I needed to offer a formal apology, etc. - all cc'd to my manager. I replied back, again copying my manager in, stating that this was ok, as I couldn't remain at a company who forced employees to sign dodgy contracts anyway.
Problem was (for them), I was a *massive* single point of failure for them at this point owing to some others leaving with no handover - hence I knew I wasn't going to be the casualty here. My manager flipped the lid at HR, got the CEO involved on threat of *him* leaving, and the whole thing massively blew up. Happy ending in that the HR person in question was fired, everyone else's contracts also had to be redone (I assumed everyone else just signed without looking which is worrying), and I actually got a pay rise out of it when higher ups realised the massive single point of failure I was.
But damn, I would've walked over crap like that. Walked pretty soon after anyway!13 -
I was hired as a senior software engineer. During handover I found out I'm actually replacing the CTO.
I queried why he was leaving and got a simple "just want a break from working" which I found odd.
Fast forward and now I also just want a break from work, permanently. This place has followed every bad practise and big no-no out there. Every bit of software is a built in house knockoff janky piece of crap that doesn't work and makes people's jobs 5000 times harder.
The UI looks worse than Windows 3.1, absolutely horrendous code formatting, worst database structure I've ever seen.
The mere mention of using a team communication tool results in being yelled at from the CEO whom communicates purely via email, who then gets annoyed when you don't reply because they sent the email to a client instead of you.
We get handed printed out "tickets" to work instead of the so called "amazing in house ticket system" built using PHP 5 and is literally crammed into an 800x600 IFrame. Yes a F$*#ing IFRAME!
It's not like we have an outdated TFS server that has work items we can use...
Why not push for changes you say. I have, many times, tried to suggest better tools. The only approval I've gotten is using PhpStorm. Everything else is shutdown immediately and you get the silent treatment.
The CEO hired me to do a job, then micromanages like crazy. I can't make UI changes, I can't make database changes, why? They insists they know best, but has admitted multiple times to not knowing SQL and literally uses a drag and drop database table builder.
Every page in the webapps we make are crammed into 800x600 iframes with more iframes inside iframes. And every time it's pointed out we need to do something, be it from internal staff or client suggestions, the CEO goes off about how the UI is industry leading and follows standards.. what in the actual f....
Literally holding on by a thread here. Why hire a CTO under the guise of being a senior developer but then reduce the work that can be done down to the level of a junior?
Sure the paycheck is really nice but no job is worth the stress, harassment and incompetent leadership from the CEO.
They've verbally abused people to the point they resign, best part is that was simply because the CEO made serious legal mistakes, was told about it by the employee then blamed it on others.21 -
It's 20-fucking-21 and I'm still asked to provide paper copies of my thesis. 😐
It's snowing outside and I don't have a usb to copy my shit and bring it to the "copy and bind" guy, so this is gonna be fun. (said no one, ever)
Oh, also, offices are closed so handover is going to be even more fun. 😐16 -
Some 'wk306' highlights from different people:
Walk around the office in his underwear, because he forgot he left his trousers in the bathroom
Run a red light outside the office due to not wearing his required glasses. When questioned by co-workers, replied "I don't follow those facist rules"
Asking if we work less will we get paid more, because the project will take longer to do (while in a startup with no funding trying to secure some)
Tell a senior dev to stop testing in his spare time, as we won't be able to release on time if he keeps finding critical security bugs
Telling me "your timezone is not my concern", when asking for help with new tooling so we don't have to be online at the same time
Blaming my team for requesting too much help, leading to his team missing deadlines, in a meeting with very senior managers. When the reason we were requesting help was the handover doc we were given was filled with lies about features being finished and "ready to ship" and lacking any unit tests
Being accused of bullying and harassment to the CEO, because someone asked "did you follow up with X about the partnership they emailed us about". The person who was responsible, forgot 4 times, and saw it as an "attack" to mention it in team meetings
Telling an entire office/building mid November they've secured funding for at least the next year, then announcing in January after the Christmas break that its cheaper to move to India, so they are closing the office in 30 days2 -
I’m a team lead in the tech team, myself and another team lead manage the on call processes for the department, so when stuff breaks we need to fix it. I assume there is sufficient documentation available for me to fix a process that is not mine.
one of the other managers processes breaks. He’s on annual leave and is away for another week. I attempt to fix the process. No documentation. What do i do?
I go to my manager the next day and tell her the process is broken and I can’t fix it because there’s no documentation and I don’t know what the full impacts are. She agreed we should leave it until he comes back from AL.
He comes back a week later. I tell him the process is broken and it’s been failing since he went on AL.
Him: we had a handover before I went on holiday
Me: no, you showed me where the ‘documentation’ was. Said documentation is not defined enough and is out of date. I didn’t want to break it further by trying to repair it when it’s not completely critical
Him: but it is critical, it has to run every day
Me: so why doesn’t it say that in the documentation?
Him: ............
Me: can you fix it please
Him: no, I’ve got too much to do having just come back from holiday
Me: more critical that a process that has to run EVERY DAY and has been failing for the past 10 DAYS??
Him: I’ll see if I have time
2 hours later...
Him: Lets put in some time for handover so you can understand the process. Is an hour long enough?
Me: I don’t know, you tell me, it’s your process, you know what’s involved and how long it should take to explain
Him: well is an hour long enough?
Me: I don’t know, it takes however long it takes you to explain it
Him: I’m asking you
...........
At this point I’m getting more and more angry, how can you not know how long your process is gonna take to explain when you’re the one that wrote it?! I fully well know that it’s gonna take longer than an hour because it’s an SSIS package that looks like a plate of spaghetti, you spend 15 minutes working out what box flows to where before even looking at any SQL, and he’s still asking me how long it’s gonna take and distracting me from my ACTUAL critical work
Man is a waste of space, so quick to give you work that isn’t his but never takes responsibility for his own... honestly have no clue whatsoever how he became a manager....
This rant doesn’t seem like much reading it back but I swear it’s the last in a looooonnngggg like of his fuck ups that other people have had to deal with 🙄🙄3 -
Me talking with my manager for handover before I leave. Just found out, there is an interview for my position, full stack dev.
No one bother asking me or the manager for tech interview and general manager from business interview alone by herself.
Manager: Do you code?
Poor soul: Yes, I do.
Manager: You are hired!
Shit, now I want to know what they ask to tech candidate without tech ppl.6 -
On my project the customer has re-signed into a contract several times when they have budget to continue work. The first time they got us to build the system was a huge success story because the team was assembled quickly and we did rapid development. Initialize repo to prod in 1.5 months. The customer asked for the same dev team. Strong dev team, a PM that doesn't take shit, and pure agile. Lets call her don't-take-shit PM.
When the customer re-signed the executive decided that she didn't like don't-take-shit PM. So the project manager gets replaced by play-by-the-rules PM who will comply with stupid requests and micromanagement. He isn't a bad PM but he tries to make everyone happy. The amount of management types executive installs on the project is massive, and development team is cut down in major ways. Customer and executive shit rolls down to the development team and we can't get anything done. The customer starts to lose faith because we can't get traction. They start demanding traditional waterfall/SDLC docs. Which causes more delay in the project.
So the executive decides that the PM can take a fall for it to save face for the company. She moves play-by-the-rules PM to another project. He starts handover to a new PM that has a history of being her pushover. The customer hadn't seen him yet so now we have push-over PM.
Play-by-the-rules PM is finally out of the project and instead of moving to a different account the company decides to "lay him off because there is no work". So basically they made him take the fall for the failure while promising reassignment, and instead let him go. This is so unfair..
Meeting with push-over PM yesterday and he shows us his plan. Identical to play-by-the-rules PM's plan that got him axed.We point that out and show him the docs that were made for it. His face clearly communicates "OH SHIT WHAT DID I SIGN UP FOR?"1 -
Attention: incomming resentful boiled up for months rant.
Hands down G2APAY is the worst because:
Merchant account aproval takes fcking months. It starts with unreasonable delays in documents approval. I mean insane nitpicking. They want to see merchants name surname and address on every god damn document that you submit even if for example bank statement doesnt include these details. I had to manually edit pdf’s just so that they would fck off and approve the merchant application. Insane requirements for document check also combined with their email only support answering only once a week you will have to wait one month just to get your account approved.
Then you get to the fun part, approval proccess for vendor gateway and webhook integration. They are nitpicking everything you can imagine: about website not having https, website forum missing some icons, merchants phone number being from another country then he is, and bunch of other hundreds of problems imagined only by them. Again combined with their one email reply per week policy you will waste atleast one month to finish up your integration.
Now finally you are their client and you think you can chill and go back to focusing on your business? Nope bro. Prepare for threatening emails. Last time I got a request to install https or my merchant application will be shut down. I was given 3 days notice on a fcking friday and had to do it.
Then g2a backend is crashing quite often. Combined with their one email per week policy you are fcked in the ass if your users were not able to pay through g2a and you will get no compensation.
Their backend documentation is shiet. Not clear how to integrate everything and after you integrate they make changes without publishing any changesets. Your integration is working? Good luck if it will still be working tomorrow.
And the very worst part is that they stopped proccessing credit cards like month ago with zero notice. Its been weeks and still zero news about bringing card proccessing back. They sad that they were acquired by some other company so shitty support got even shittier now while they are in a proccess of handover.
So yeah thats the worst vendor I have ever seen in my life. For example integrating paypal took me 30 minutes. Integrating stripe and getting all documents reviewed took me one business day. Same with paymentwall integration and document approval took 1 business day. Support is amazing and even have a phone number that I can reach if urgent problems arise. Thats how it should be. Thats why I can pay percentage of my transactions with a smile for them.
Sorry for the typos since im typing on my shiet phone while driving.
Eat a bag of dicks g2apay. I hope you go bankrupt and shutdown.21 -
Currently doing my final handover, the "senior" developer is trying hardly to find things for me to change not in the code, no, in the documentation. Bitch, this is the ~most~ only documented project in the whole company!
#5 days left.3 -
For two projects, I have been in a solo work pattern, been a time bottleneck, and been irreplaceable on the projects. Four months ago I told management, "If anything happens to me these projects will be in trouble. I want to train a backup. I can't sustain this momentum. It isn't good for me, or for the success of these projects."
Four months later I still have no backup. They decided to diversity hire some new developers in the wrong area and now there is no money for a backup for me. I can't do all the work on both projects as a solo developer. I could have if I wasn't pushed into doing trial and error development on a poorly defined MS Dynamics API. Since the projects were behind schedule the customers lost confidence in the company to deliver. So the executives railroaded both project managers to save face.
Instead of addressing the development issues they did a bunch of other silly things. I got a job offer lined up and issued my resignation. That news absolutely exploded. After resigning my executive decided to say how awful I am in front of the customer in an attempt to save face for the company. The customer contacted the recently railroaded project manager and asks why. Former project manager tells customer, "You noticed how much faster the development of that part of the application went when he joined. You noticed how much better the quality of the project was. What do you think is happening? Do you think that a very good developer and an experienced project manager are to blame for the failures here?" So the executive is 13/10 pissed off because I may have accidentally struck a death blow for millions of dollars of business. I committed to taking care of the handover to the customer, and the company can't afford to get rid of me without completely losing confidence of the customer. The developers that I work with don't blame me at all and they are disgruntled that executive tried to character assassinate me and realize that it could have been them. I sense that I also may have initiated a developer mass-exodus. So the last few days have been the most stressful of my career but none of it is sticking to me because I followed all of the correct process.
You play stupid games you win stupid prizes.4 -
After reaching the pinnacle of my latent burnout and mental overload lately I quit and managed to get paid leave for the rest of the notice period through hr as I told them I'm not able to work for them anymore and else had to go on sick leave. My brain just had to have a clean cut and blocked me from
getting into their overcomplex and shitty, unplanned projects as I see no value in doing anything for them anymore. I gave them all my access keys and a small handover, but it was clear that they would run into problems without me, cause I've been doing like 5 jobs there due to developer shortage. Now I still get requests from my manager even though I had an operation and spent last week in the hospital and am still recovering for the next two weeks. He's still trying to build pressure as if it was my fault that we never got time to document stuff properly and automate things that have to be automated. He ignored every recommendation I made in past to ensure that things keep running when I leave, as I always knew that I wouldn't do this shit for long. It was always more important to please bosses ever-changing requests and stupid whims as fast as possible at the cost of quality, pressuring us into putting projects live at 80% to meet random deadlines we had no say on. What a fucking asshole trying to put the responsibility on me now. Not my problem anymore. Have fun finding someone else taking over that shithole of an underengineered software-architecture. I'm out!1 -
Is it normal to have to sit in hours upon hours of handover sessions for a spaghetti software solution?
There's no documentation, we have to create it, hence the hours upon hours of handover sessions.
I'm so fucking burned out from the past two weeks' meetings.4 -
So I quit after 10 years of service to start my own company. Never had the resources or tools to put the full documentation effort in unfortunately. Trying my best for a handover. The board have started to treat me like shit, no respect after a decade of propping these assholes up. I have offered my services post employment but they are being difficult.
Just got an email and call from our data centre... they are shutting down the site and can't relocate our boxes physically due to the ip ranges in use. Only option is to migrate the sites and code to new boxes. Which means patching of db and code for newer versions.
Do I leave them with this mess since they are being assholes or try to sort it properly in my last few weeks while I also document..3 -
Everytime you tell yourself "This time I'm going to make them stop putting the cart before the horse again!!! No more forced shit implementations!!! NO MORE ! I'm strong!!"
The last hour in the next week:
- Selinux: off
- Firewall: Any-Any
- Application data: Everything installed on OS disc.
- Documentation: At best, someone remembers the server supposed-to-be dns record
- Service Accounts: Your domain admin account and sysadmin for databases.
- Patching: DON'T EVER THINK ABOUT IT..AND NO REBOOTING! I have set very important runtime variables.
- Backup: Maybe someone else will set this up.
- Monitoring: Not needed since clients will create tickets if system fails.
- Production Status: vague at best. Sort of silently transitioned to production.
- Handover status: Probably, but I quit before the project closed.
! -
It's been a while DevRant!
Straight back into it with a rant that no doubt many of us have experienced.
I've been in my current job for a year and a half & accepted the role on lower pay than I normally would as it's in my home town, and jobs in development are scarce.
My background is in Full Stack Development & have a wealth of AWS experience, secure SaaS stacks etc.
My current role is a PHP Systems Developer, a step down from a senior role I was in, but a much bigger company, closer to home, with seemingly a lot more career progression.
My job role/descriptions states the following as desired:
PHP, T-SQL, MySQL, HTML, CSS, JavaScript, Jquery, XML
I am also well versed in various JS frameworks, PHP Frameworks, JAVA, C# as well as other things such as:
Xamarin, Unity3D, Vue, React, Ionic, S3, Cognito, ECS, EBS, EC2, RDS, DynamoDB etc etc.
A couple of months in, I took on all of the external web sites/apps, which historically sit with our Marketing department.
This was all over the place, and I brought it into some sort of control. The previous marketing developer hadn't left and AWS access key, so our GitLabs instance was buggered... that's one example of many many many that I had to work out and piece together, above and beyond my job role.
Done with a smile.
Did a handover to the new Marketing Dev, who still avoid certain work, meaning it gets put onto me. I have had a many a conversation with my line manager about how this is above and beyond what I was hired for and he agrees.
For the last 9 months, I have been working on a JAVA application with ML on the back end, completely separate from what the colleagues in my team do daily (tickets, reports, BI, MI etc.) and in a multi-threaded languages doing much more complicated work.
This is a prototype, been in development for 2 years before I go my hands on it. I needed to redo the entire UI, as well as add in soo many new features it was untrue (in 2 years there was no proper requirements gathering).
I was tasked initially with optimising the original code which utilised a single model & controller :o then after the first discussion with the product owner, it was clear they wanted a lot more features adding in, and that no requirement gathering had every been done effectively.
Throughout the last 9 month, arbitrary deadlines have been set, and I have pulled out all the stops, often doing work in my own time without compensation to meet deadlines set by our director (who is under the C-Suite, CEO, CTO etc.)
During this time, it became apparent that they want to take this product to market, and make it as a SaaS solution, so, given my experience, I was excited for this, and have developed quite a robust but high level view of the infrastructure we need, the Lambda / serverless functions/services we would want to set up, how we would use an API gateway and Cognito with custom claims etc etc etc.
Tomorrow, I go to London to speak with a major cloud company (one of the big ones) to discuss potential approaches & ways to stream the data we require etc.
I love this type of work, however, it is 100% so far above my current job role, and the current level (junior/mid level PHP dev at best) of pay we are given is no where near suitable for what I am doing, and have been doing for all this time, proven, consistent work.
Every conversation I have had with my line manager he tells me how I'm his best employee and how he doesn't want to lose me, and how I am worth the pay rise, (carrot dangling maybe?).
Generally I do believe him, as I too have lived in the culture of this company and there is ALOT of technical debt. Especially so with our Director who has no technical background at all.
Appraisal/review time comes around, I put in a request for a pay rise, along with market rates, lots of details, rates sources from multiple places.
As well that, I also had a job offer, and I rejected it despite it being on a lot more money for the same role as my job description (I rejected due to certain things that didn't sit well with me during the interview).
I used this in my review, and stated I had already rejected it as this is where I want to be, but wanted to use this offer as part of my research for market rates for the role I am employed to do, not the one I am doing.
My pay rise, which was only a small one really (5k, we bring in millions) to bring me in line with what is more suitable for my skills in the job I was employed to do alone.
This was rejected due to a period of sickness, despite, having made up ALL that time without compensation as mentioned.
I'm now unsure what to do, as this was rejected by my director, after my line manager agreed it, before it got to the COO etc.
Even though he sits behind me, sees all the work I put in, creates the arbitrary deadlines that I do work without compensation for, because I was sick, I'm not allowed a pay rise (doctors notes etc supplied).
What would you do in this situation?4 -
So one of the PMs arranged a meeting last week for today, where he was going to "talk to us about a project we're currently working on".
Today the PM was off, so myself and a few other managers attended said meeting. Once everyone was in, one of the managers looked around, then at me and stated: "Have you not prepared your handover for this meeting?". I was just sat there like "WTF? What handover!?"
Apparently the PM decided to raise a meeting saying he was going to talk about the project, but then told all the other managers I was going to give a handover. He told everyone, but me!!
No wonder he didn't show up for it -.-2 -
Current status: Writing a markdown document containing all my tips and tricks for fixing bugs in our apps so we can handover to maintenance. Including files I commonly have to look in, handy keyboard shortcuts, IDE settings and other tools that have made debugging easier. I figure if these guys are having a bunch of legacy apps dumped on them when they have no iOS experience, I should help them out as much as I can before I move projects.1
-
Started a new role as a single handed Dev/analyst in a small company. Discovered by predecessor had left no handover notes on his (unnecessarily complex) weekly reports, or indeed on the table structure of any of the systems.
The three weeks into the role the managing director gets sent to prison!
For fraud.
I left...... quickly.1 -
This is probably the worst place to start my Rant saga but this is recent (this is one of the last few episodes of a 3 series cluster fuck of a job so you're missing out on all the straws that go into breaking the camels back and making him unaccommodating)
TL;DR I do good work, management dont like me and go out their way to try and fuck up my days
So, lets start, I'm a contractor, got funeral Tuesday, book leave, book WFH for day after.
I leave in 3 weeks, woman who is the CIO's right hand bitch takes me into a room the next day or so in the morning to discuss my WFH day. Leave on tuesday is cool but this WFH day...there's only so long until I'm gone so they want me to stay in for more face-to-face time blah blah blah (considering this woman isn't even part of the project I'm working on anymore because she decided to deflect it onto a underqualified junior with no PM experience)
So I sit there, thinking of all the blood and sweat that I have shed, the mountains I've moved just to be told to move the mountain somewhere else and whether coming in would kill me (in other words im fucking burnt out!!! I have built their GDPR database and app backend single-handedly with no requirements, project managers who can't plan and being chastised for asking for documentation/plan/anything written down and having the CIO who is also the fucking DPO ignore any emails/slack I send him relating to the project and having to keep up with a team of devs....).
So because there was a momentary silence, she decided to fill the gap
"Oh, you've done some good work so far and I wouldn't want you to ruin it all in these last 3 weeks. So just come in on the Wednesday so that we can have you here."
Hmm....yeah...i didn't notice what she had ACTUALLY said there, still thinking about can i be fucked? So she decides to add
"...there's only 3 weeks left, wouldn't want you to burn any bridges. Remember, we still have to give you a reference"
....Okay....shots fired. So i respond
"You saying, if I take a WFH day, you'll give me a bad reference?"
"Noooo no no no, not saying that, just that you've done good work and we wouldn't want you to ruin it"
"With one wfh day?"
"We just want you to come in because the developers might be coming here that week"
"Oh... I hear that...what day?"
"I dunno, it's not been booked yet"
".............................I'll think about it"
"There's nothing to consider"
*Start leaving room* "I'll think about it...."
So cool, obviously, had a think, decide to shoot over an email (or more accurately, a collection of bullets). Which basically said, in devRant translation, "Fuck y'all, I'm WFH on that day, I wish a motherfucker would fuck up my reference, we can go that way if you want it. *snaps fingers* I. WISH. YOU. WOULD! "
Woman says "I wasn't threatening you, was just saying...dont ruin your last 3 weeks, wouldn't want you to burn any bridges and that we still have to give you a reference"
What kind of Godfather comment is that?
Come in today, the CIO, who is a prick who don't like me for whatever reason, sends me long email trying to disrespect me and in the midst says "I’m sorry that you have chosen to react like this, I’m sure that [my bitch] was conveying a position that your last three weeks of contract are crucial for a smooth handover. I have made the decision to not require you to work from home on Wednesday. I understand you are on leave on Tuesday and therefore this is now extended to include Wednesday. I look forward to seeing you back in the office on Thursday. I hope this will make the situation better for all parties."
.................................thought you lot needed me in the office to ensure a smooth handover................logic..........people.............where the fuck do you get yours from!?!?!?!? All this just so they can say "We made the decision at the end :cool:" -
The DEVRANT SEARCH could be improved.
Often wrong results are on top, because the algo accepts 1 different character and tags have no priority.
Example: I clicked on the tag "hangover".
Among the top results there were rants with "handover" and "hannover" (German city).
The first rant with the tag "hangover" was at position 18
Wouldnt the search result be better with another logic?
Priority 1: Tags with exactly the same word
Priority 2: Rants with exactly the same word
Priority 3: Tags with similar words/expressions
Priority 4: Rants with similar words/expressions -
Today is the last day of my placement.
Over the past year, I began working on small front end bugs, to becoming the sole front end developer on the project, to being full stack.
Back in July, I and the other dev on the project released the app into the wild. It now is reaching 100 users.
The app has a lot of external dependencies (10+), one of which could cripple it entirely should it cut us off (which they can do at any time, it's a free API).
I was given, effectively a week and a two days to do a complete handover/transfer of knowledge to the placement student that will be taking my place. They hadn't touched front end (like me) when starting, but also had no experience in node/js.
As of this, I can't leave feeling like I've fully completed my work, and I feel bad leaving the new guy with these clients. Undoubtedly I'll be doing some off-the-record help. -
"We're surprised some tasks were getting done faster after you left."
No shit, Sherlock. 3 teams, each having multiple devs waiting with their own support queue, sat in on my handover. If they weren't getting done faster you're in a lot more trouble than you thought and I'd have jumped ship much faster. -
When IT/project management is like some ideology that works out on the paper but everyone is too stupid to implement it properly.